“We signed the lease—what actually has to happen before Monday?”

A new address deserves the same day-one discipline as a new hire.

Employee onboarding already gives a new person a checklist for accounts, access, and a known place to ask for help. A new office or a new site needs the same discipline applied to a location instead of a person—with the Microsoft 365 side kept clearly separate from the physical one.

01

Weeks before move-in

  • Confirm who actually needs access at the new address, and from when
  • Update any public-facing shared mailbox, distribution list, or contact details tied to the old address
  • Name a single point of contact for move-day questions
  • Order or transfer printers, scanners, and other office hardware through your equipment vendor
02

The week of the move

  • Confirm each person’s device and account access travels with them intact
  • Have the office network and Wi-Fi checked before the first full day, not after
  • Keep the named point of contact visible to everyone during the transition
03

The first week at the new address

  • Connect existing, already-configured printers to the people who need them
  • Watch for the same everyday requests as any other week: access, mail, Teams, files
  • Confirm guest or visitor access if the new site needs it

Name the owner before moving day

A checklist is only useful if each line has one owner.

Mixing Microsoft 365 account work with physical setup is the most common way a new-office checklist stalls.

TaskUsual owner
Physical network, cabling, and internet serviceNetwork installer or internet provider
Printer and office-equipment hardwareOffice-equipment vendor
Microsoft 365 accounts, shared mailboxes, and licence assignmentM365 Desk, once your business approves the change
Day-one troubleshooting once the site is onlineM365 Desk
Lease, furniture, and physical office logisticsYour own office or facilities owner
A confirmed move date
The date people should expect to be working from the new address, separate from whenever the lease itself starts.
A people list for the new address
Who works there full-time, who splits time between sites, and who never sets foot there at all.
A named network and hardware owner
Whoever is installing cabling, Wi-Fi, and printers, so the desk knows who to point a Microsoft 365-adjacent symptom toward.
An honest address-change list
Every shared mailbox, distribution list, and public contact detail that quietly still points at the old address.

Common questions

Where the checklist ends and a vendor begins.

Does the desk set up the new office’s network?

No. Physical cabling, routers, and access points are network infrastructure—the same boundary published for Wi-Fi troubleshooting. The desk supports the Microsoft 365 accounts and access that run on top of it.

Can the desk add a shared mailbox for the new location?

Yes. A new or renamed shared mailbox for a new address is a routine access request, the same as any other shared-mailbox change.

What if we’re only adding a few remote employees, not a whole office?

That is closer to remote and travel setup than a new-site checklist—see that guide for the smaller-scale version of this question.